local · Pointe-Claire, QC (H9R)
Three Pointe-Claire road works start November 9
Archived information. Verify dates and current conditions with the original sources.

Three dated work notices from the city are set for November 9 to 13. On Delmar Avenue, southbound traffic will be reduced between Augusta and Hymus on November 9 from 10 a.m. to 2 p.m., with alternating traffic and a closed sidewalk. On the Félix-Leclerc service road westbound, the right lane will be affected between Bancroft and Tecumseh from November 9 to 13, with the sidewalk closed. On Brunswick Boulevard eastbound, the two right lanes will be affected between Syrah and Auto Plaza from November 9 to 13, from 7 a.m. to 5 p.m., with the sidewalk closed.